PROPOSED COPPER PROCESSING PLANT ON FARM NO. 11383 IN MUMBWA DISTRICT OF CENTRAL PROVINCE BY CEDARS MINERALS LIMITED

  • ZEMA Home
  • Docs
  • PROPOSED COPPER PROCESSING PLANT ON FARM NO. 11383 IN MUMBWA DISTRICT OF CENTRAL PROVINCE BY CEDARS MINERALS LIMITED

PROPOSED COPPER PROCESSING PLANT ON FARM NO. 11383 IN MUMBWA DISTRICT OF CENTRAL PROVINCE BY CEDARS MINERALS LIMITED

Cedars Minerals Limited (CML) known as the Developer, intends to develop a copper processing concentrator and associated facilities in Kitumba area of Mumbwa District in Central Province. CML intends to construct a concentrator to process 300 tons per day of copper ore producing approximately 10 tons of concentrate sourced from the big concession area of Mumbwa district. Cedars Minerals Limited has also engaged a local license owner –Minetech Resources Limited and signed a copper ore supplying agreement with the same company to shall supply up to 300 tons per day of Copper Ores. The proposed plant is expected to have a runtime that will be tied to the availability of the supplied ore resources. Cedars Minerals Limited (CML).intends to construct the plant on farm No. 11383 in Kitumba area of Mumbwa district. It will ensure environmental sustainability of operations of the plant through preparation of the EIA and therein, an Environmental Management Plan (EMP) as per the Zambian legal requirements.

Download: EIS – Copper Processing Plant in Mumbwa Districts by Cedars Minerals Limited