EIS – PROPOSED WATER ABSTRACTION & PIPELINE PROJECT FOR THE THERMAL POWER PLANT IN SIAMEJA AZILUNDU AREA OF SENIOR CHIEF MWEEMBA’S CHIEFDOM OF SINAZONGWE DISTRICT BY EVER GREAT

Ever Great Energy Company Limited is a Zambian owned private Company incorporated in January 2024. However, the directors of the company have vast experience in business and the mining sector.


Zambia’s main hydroelectric power facilities are the Kariba North Bank Power Station (1,080 MW), Kafue Gorge Power Station (980MW), Kafue Gorge Lower Power Station (750 MW), Victoria Falls Power Station (108 MW), Lunsemfwa Hydro Power Station (56 MW), and the Itezhi Tezhi Hydro Power Station (120 MW). Maamba Collieries Limited operates Zambia’s largest IPP, a coal-fired thermal power plant commissioned in 2016, which generates up to 300 MW. From the information given above, it can be noted that the country heavily relies on hydroelectric power which accounts for about 83% of installed generation capacity, and the changes in the climate (drought) has often greatly reduced water levels in reservoir dams, leading to a severe decrease in electricity generation. The installed generation capacity in Zambia is 3356.6 MW.