PROPOSED250MWp SOLAR PV POWER PLANT AND AN ASSOCIATED 10 KM, 330KV TRANSMISSION LINE (TL) PROJECT, KAFUE DISTRICT, LUSAKAPROVINCE, ZAMBIA

  • ZEMA Home
  • Docs
  • PROPOSED250MWp SOLAR PV POWER PLANT AND AN ASSOCIATED 10 KM, 330KV TRANSMISSION LINE (TL) PROJECT, KAFUE DISTRICT, LUSAKAPROVINCE, ZAMBIA
View Categories

PROPOSED250MWp SOLAR PV POWER PLANT AND AN ASSOCIATED 10 KM, 330KV TRANSMISSION LINE (TL) PROJECT, KAFUE DISTRICT, LUSAKAPROVINCE, ZAMBIA

Copperbelt Energy Corporation PLC (CEC), through its 100%-owned subsidiary Twalumbu Solar Limited, proposes a 250 MWp utility-scale, grid-connected Solar PV power plant with an associated ~10 km, 330 kV Transmission Tine (TL) to the Kafue West Switching Station. The project advances Government policy under the 2019 National Energy Policy and the 8NDP to diversify generation, enhance energy security, and expand private investment in renewables. CEC has engaged Crownbit Environmental Solutions Limited to prepare the ESIA in accordance with the Environmental Management Act, EIA Regulations (SI 28 of 1997, as amended) and international best practice (incl. IFC PS).