---
title: PROPOSED CONSTRUCTION AND OPERATION OF A 27.54 MILLION LITRES (WHITE PETROLEUM PRODUCT) AND 2,129MT (LPG) BULK FUEL STORAGE DEPOT
description: "**PROPOSED CONSTRUCTION AND OPERATION OF A 27.54 MILLION LITRES (WHITE PETROLEUM PRODUCT) AND 2,129MT (LPG) BULK FUEL STORAGE DEPOT, LUBRICANT BLENDING PLANT & FUEL SERVICE STATION ON SUBDIVISION NO. 88045 OF FARM NO. 10377 IN 21 MILES AREA OF CHIBOMBO…"
url: "https://www.zema.org.zm/docs/7995-2/"
updated: "2022-12-27"
category: Environmental Impact Statements
---

# PROPOSED CONSTRUCTION AND OPERATION OF A 27.54 MILLION LITRES (WHITE PETROLEUM PRODUCT) AND 2,129MT (LPG) BULK FUEL STORAGE DEPOT

**PROPOSED CONSTRUCTION AND OPERATION OF A 27.54 MILLION LITRES (WHITE PETROLEUM PRODUCT) AND 2,129MT (LPG) BULK FUEL STORAGE DEPOT, LUBRICANT BLENDING PLANT & FUEL SERVICE STATION ON SUBDIVISION NO. 88045 OF FARM NO. 10377 IN 21 MILES AREA OF CHIBOMBO DISTRICT OF CENTRAL PROVINCE BY HARVEST GROUP OF COMPANIES LIMITED**

**Introduction**
 The economy cannot operate without energy. Energy is a one of the major catalysts of development for most sectors of the Zambian economy. Energy sector has proved to be vital in the quest to achieving sustainable economic development in the country. At the commencement of the Seventh National Development Plan (SNDP) period (2017-2021), the energy sector goal was to ensure adequate and reliable supply of energy at the lowest economic, social and environmental cost. This entails that the sector planned on focusing on exploiting the most cost-effective fuel/energy generation/acquiring methods and putting in place an efficient and effective fuel supply system. The quest by Harvest Group of Companies Limited to undertake this project of establishing a bulk fuel storage depot in Chibombo District of Central Province aims at supporting the objectives of SNDP.

**[FINAL EIS Report _ HGCL KATUBA FUEL DEPOT Oct 2022](https://www.zema.org.zm/wp-content/uploads/2022/12/FINAL-EIS-Report-_-HGCL-KATUBA-FUEL-DEPOT-Oct-2022.pdf)**
